You are here:

AIR DRYER

DREAM DM – 75G

  • Rated Flow: 10.8m3/min
  • Pressure: 0.97 Mps
  • Power: 55 kW
  • Dew Point: 10 or less press

TYPE CONTROL

Ejector control system

 

USAGE

Air exchange and protection of compressed air systems

 

CHARACTERISTICS

  • Utilizes nickel-plated brass tubing that is corrosion-resistant for prolonged service life
  • Uses a special copper tube and fin air-to-air heat exchanger to avoid condensation in the pipeline.
  • For the simplest operation, a computerized control panel and flowchart display are included.
  • For simpler maintenance, connect evaporators with a flange when they have a capacity of 300hp or more.

 

WORKING PRINCIPLES

Refrigerated Air Dryer is according as air freeze principle. The water would been separated out from compressed air by cooling equipment and separator when the air tamperature is dew point temperature, then the water would been vented by drain valve on automatic. At the same time, the solid granule of more than and oil would been removed

Model DM – 75G
Voltage 380~450 (V)
Max pressure 0.97Mpa
Frequency 50Hz
Capacity 10.8m3/min
Output Compressor 55kW
Ambient Temperature 5 °C – 40°C
Dew point 10 or less press
Output Rating 2.2kW
Rated Amps. 5.5/4.7 (A)
Capacity control System Ejector
Refrigerant R407C
Dimension (WxDxH) 356 x 903 x 1247 (mm)
Weight 140kg








    * Required

    Technical Specification
    Model DM – 75G
    Voltage 380~450 (V)
    Max pressure 0.97Mpa
    Frequency 50Hz
    Capacity 10.8m3/min
    Output Compressor 55kW
    Ambient Temperature 5 °C – 40°C
    Dew point 10 or less press
    Output Rating 2.2kW
    Rated Amps. 5.5/4.7 (A)
    Capacity control System Ejector
    Refrigerant R407C
    Dimension (WxDxH) 356 x 903 x 1247 (mm)
    Weight 140kg
    Contact Us








      * Required

      Dehumidifier

           Dehumidifier AR18000SE

           Dehumidifier KL-LFZ12000

           Dehumidifier LT-CTD50E

           Dehumidifier DM-1500R

      Vacuum

           Abrasive Recovery VR-E8

           Abrasive Recovery VR-90

           Suction Machine K-V8

      Dust Collector

           Dust Collector LB-PC 16

           Dust Collector LB-PC 20

      Spraying Equipment

           Evolution G-30H

      Abrasive Blaster

           Blastrac EBE 500S

      Compressor

           Fusheng SA75

      Air Cooler

           AirBlast ABAC-200/ PN 800CFM

           DMD- 25 HTF

      Compressor Air Dryer

           Fusheng FR100AP

           DMD- 25 HTF

      Cobra Scaffolding

           Cobra Scaffolding

      CONTACT US

      Need more information

      Industrial equipment rental

      VIVABLAST supplies equipment rental services for machinery used in several different industrial applications

      Find more with us.

      Subscribe Today!

      Send message

      If you’re interested in Air Dryer Dream DM-75G, VIVATECHS offers a wide range of services and resource persons to assist you.

      Blog

      VIVABLAST proudly participated in the Triflex Asia Technical Seminar 2024

      VIVABLAST had the privilege of attending the Triflex Asia Technical Seminar held in Bangkok, Thailand. This notable event gathered sales representatives and contractors from across the region, including Singapore, China, Hong Kong, Australia, Indonesia, Malaysia, Thailand, Vietnam, and India.   Over the course of three days, the seminar offered valuable insights through in-depth discussions on…

      Read more

      ZINGA® – The optimal solution for protecting solar panel systems

      Rust is the number one “enemy” of solar panel mounting structures, leading to rapid degradation and reducing system efficiency.   To address this issue, ZINGA® has been developed as the optimal protection solution. Unlike conventional anti-corrosion paints, ZINGA® operates based on an electrochemical mechanism, creating an active protective layer that self-heals when scratched. This ensures…

      Read more

      Dehumidification In Abrasive Blasting

      Discover why dehumidification is critical for successful abrasive blasting!   Without dehumidification during the blasting and coating process, corrosion can occur on exposed surfaces before a protective coating is applied, leading to significant operational challenges. If a blasted surface remains exposed for too long, ‘flash rust’ can develop, making the surface unsuitable for coating within…

      Read more